Elon Musk’s SpaceX to Make Second Bid to Launch Starship Rocket on Test Flight

SpaceX is to make a second attempt on Thursday to carry out the first test flight of Starship, the most powerful rocket ever built, designed to send astronauts to the Moon, Mars and beyond.

A planned liftoff Monday of the gigantic rocket was aborted less than 10 minutes ahead of the scheduled launch because of a pressurization issue in the first-stage booster.

The new window for liftoff from Starbase, the SpaceX spaceport in Boca Chica, Texas, opens on Thursday at 8:28 am Central Time (1328 GMT) and lasts for about an hour, SpaceX said.

SpaceX founder Elon Musk, who has sought to play down expectations for the risk-laden inaugural test flight, cast some doubt on whether the launch will actually go ahead on Thursday.

“The team is working around the clock on many issues,” Musk tweeted late Tuesday. “Maybe 4/20, maybe not.”

The US space agency NASA has picked the Starship spacecraft to ferry astronauts to the Moon in late 2025 — a mission known as Artemis III — for the first time since the Apollo program ended in 1972.

Starship consists of a 164-foot (50-meter) tall spacecraft designed to carry crew and cargo that sits atop a 230-foot tall first-stage Super Heavy booster rocket.

SpaceX conducted a successful test-firing of the 33 massive Raptor engines on the first-stage booster in February but the Starship spacecraft and the Super Heavy rocket have never flown together.

The integrated test flight is intended to assess their performance in combination.

Monday’s launch was scrubbed because of a frozen pressure valve on the Super Heavy booster and SpaceX needed to delay another try for 48 hours to recycle the liquid methane and liquid oxygen that fuels the rocket.

Musk had warned ahead of the launch that delays and technical issues were likely.

“It’s a very risky flight,” he said. “It’s the first launch of a very complicated, gigantic rocket.

“There’s a million ways this rocket could fail,” Musk said. “We’re going to be very careful and if we see anything that gives us concern, we’ll postpone.”

Multi-planet species

NASA will take astronauts to lunar orbit itself in November 2024 using its own heavy rocket called the Space Launch System (SLS), which has been in development for more than a decade.

Starship is both bigger and more powerful than SLS and capable of lifting a payload of more than 100 metric tonnes into orbit.

It generates 17 million pounds of thrust, more than twice that of the Saturn V rockets used to send Apollo astronauts to the Moon.

The plan for the integrated test flight is for the Super Heavy booster to separate from Starship about three minutes after launch and splash down in the Gulf of Mexico.

Starship, which has six engines of its own, will continue to an altitude of nearly 150 miles, completing a near-circle of the Earth before splashing down in the Pacific Ocean near Hawaii about 90 minutes after launch.

“If it gets to orbit, that’s a massive success,” Musk said.

“If we get far enough away from the launchpad before something goes wrong then I think I would consider that to be a success,” he said. “Just don’t blow up the launchpad.”

SpaceX foresees eventually putting a Starship into orbit, and then refueling it with another Starship so it can continue on a journey to Mars or beyond.

Musk said the goal is to make Starship reusable and bring down the price to a few million dollars per flight.

“In the long run — long run meaning, I don’t know, two or three years — we should achieve full and rapid reusability,” he said.

The eventual objective is to establish bases on the Moon and Mars and put humans on the “path to being a multi-planet civilization,” Musk said.

“We are at this brief moment in civilization where it is possible to become a multi-planet species,” he said. “That’s our goal. I think we’ve got a chance.”


Affiliate links may be automatically generated – see our ethics statement for details.

Check out our Latest News and Follow us at Facebook

Original Source

NASA’s Artemis 1 Launch Faces Another Obstacle, Next Launch Window in October

NASA’s historic uncrewed mission to the Moon is facing fresh difficulties. After technical problems derailed two launch attempts several weeks ago, a new liftoff of the Artemis 1 mission scheduled for Tuesday is now threatened by a storm gathering in the Caribbean.

The storm, which has not yet been assigned a name, is currently located south of the Dominican Republic.

But it is expected to grow into a hurricane in the coming days and could move north to Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

“Our plan A is to stay to course and to get the launch off on September 27,” Mike Bolger, NASA’s exploration ground systems manager, told reporters on Friday. “But we realised we also need to be really paying attention and thinking about a plan B.”

That would entail wheeling the giant Space Launch System rocket back to the Vehicle Assembly Building, known as VAB.

“If we were to go down to Plan B we need a couple days to pivot from our current tanking test or launch configuration to execute rollback and get back into the protection of the VAB,” Bolger said, adding that a decision should be made by early afternoon on Saturday.

On the launch pad the orange and white SLS rocket can withstand wind gusts of up to 137 kilometres per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

The next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns. But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The launch dates depend on NASA receiving a special waiver to avoid having to retest batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range to a populated area.

On Tuesday the launch window will open at 11:37 local time and will last 70 minutes.

If the rocket takes off that day, the mission will last 39 days before it lands in the Pacific Ocean on November 5.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.


Check out our Latest News and Follow us at Facebook

Original Source

Exit mobile version